Am I behind schedule Day 20 (No Nutes) Autoflower

So you’re saying my light is rough rough bc it only puts out 180 watts? What wattage should I be aiming for? Also spent a few hours the other day strain hunting for potential breeding pairings. Have you tried any of them?
God I hope my buds come out looking like that. From the frostiness to the size. Do you remember how much you got from that harvest?


Naw thats good for a single plant.
Had to look through the thread to see what I said earlier.

Only an ounce or two. It was some good weed! Made bomb rosin! I pulled out 10 grams and cured it for little over a month. Some of my best honestly.

Blue cheese
Northern Lights (grown it)
Death Star
Lemon Kush
Durbin Pouson
Acapulco Gold (Bad ass and Old school)
Hindu Kush
Afgahni Kush
Im a motha @#%@en cannaisseur! :slight_smile:
Love the strain names! If your gonna call one Sirius Black you gotta include:

Depends on your space and quantity you wanna grow. 200-250 a plant is where I wanna end up.

This is actually already a strain sadly, but the Black Afghan looks dope! My initial plan with the purple (my favorite color) was to blend 2-3 purple strains and call it Purple Passion but as you may already know that’s also a strain. But I’m super interested in the Purple Bubba x Grandaddy Purple x Grape Ape bc these are all supposed to be big chungas indica’s and the blend of the 3 should make a euphoric couch lock with gorgeous leaves, resin production, and bud structure. Idk what I’d call it. Maybe Purple Pounder :joy::joy: or maybe just Purple Stuff.

I’m trying to get there my guy. I’ve definitely tried a lot more than I’ve listed there but I’m jelly of all the landrace strains you’ve tried. Durban Poison was faaaaantaaaaaastic so I can only imagine the others are just as good. I really want to try Lamb’s Breath/Lamb’s Bread mainly because that’s what Bob Marley was puffing on.

I also think Sour Diesel x OG Kush x Durban Poison would be a fantastic strain if the terpene profiles were to blend right.

Same thing with my Mushroom Wizard strain. All 3 of the components have been fantastic highs that were similar yet different, so if I could get them to inherit each other’s differences then sheeeeesh

Grape ape is a fave of mine. Gdp also.
Durban is my step daughters fave.

I haven’t gotten to try either one yet but I definitely look forward to it.

Well she has good taste bc it’s one of my favorite as well as of a few months ago! Wishing 30 minutes I was so trashed it took me 3 years just to finish a though to put it into a sentence, and then when I tried to talk and think :joy::joy: fugget about it. I found out what sativa actually means lol

1 Like

You havent had GDP yet? Oh man you gotta get you some of that! ILGM has a great GDP.

2 Likes

I will most definitely be trying it sometime soon bc I’m going to make some rudimentary attempts at my Purple Indica mixture of PB x GDP x GA.

Also my Blue Lights is noooooot happy with my in ph’d water :sweat_smile::sweat_smile: her leaves got some claws on her which obviously was to be expected I just feel so bad

1 Like

Show me

It’s not concerning imo but I’m also not as experienced as you do if you think I should take action I most definitely will

1 Like

Also here’s some updates on the Wedding Cake. It’s grown a surprising amount these past few days. Didn’t take any pics just redo videos so you get screen shots lol sorry









what was her last runoff Ph and TDS?

1 Like

@Docnraq
I couldn’t tell you on either one of those. I use test strips so I know it was at or over 1,000 and at or under 6.2

1 Like

thats good enough in this instance. looks like the begining of nitrogen toxicity. id linbk a pic but Im not on my phone. give her water, next she needs, phd high to 6.8 (or as close to that as you can get, an even 7 would be fine in this instance) might have to do it twice. she will be ok.

1 Like

I did go pretty heavy on my tiger Bloom this time around so that could be a cause as well. I’ll scale it back to where I usually have it next time I feed as well.

1 Like


Skip a feed.

1 Like

I almost died earlier. I was moving a Wedding Cake branch, and when I turned I launched my Great White Shark. I mean I fuckin yuhyuhyeeted that bitch and my heart blew through my ass like a shotgun shell covered in exlax my guy. It literally dumped completely out of the cup so I put it back in the cup, and transplanted to a slightly bigger pot so it would have more room to recover. My rootball looks somewhat decent though. It looked like a mirrored version of the stem and leaves just roots. I know she’s probably going to still be shocked but she at least looks normal again already.

Also here are the rest of tonight’s photos.






1 Like

@Docnraq
Just in case it didn’t notify you bc it doesn’t show I replied to you or anything and if it did, well, my bad coach :joy:

1 Like

I did the same with Ivy on my first run. Poor girl. She looks good. She didnt fold like a blanket, sometimes after extreme stress all the leaves and everything will just fall down. Not seeing that is a goid thing. Hate to admit but I laughed my ass off reading that. Glad she looks ok.

I am set to watch your thread, I get notified anytime anyone posts in this thread.

My first run one of my Northern Lights did that. Humidifier/timer malfunctioned, and it ran all night, and I tried drying with my heater and as soon as that heat heat directly on her she dropped it was like watching her soul leave her body.

I didn’t realize this was a thing! I’ve just noticed it shows activity in threads I haven’t visited. How do you watch a thread?

Glad could be of service lol