She looks fit as afiddle my friend. Id hardly call that discolored. And she doesnt look at all unhealthy.
@Graysin would you agree?
That color is more of a lime green with a yellowing splotch on the other leaf but maybe I’m just trippin.
Think your just trippin bro. She looks good.
If you suspect it may be overwatered, chances are high it’s overwatered. Wait another day or two before you water her again, she’ll sort herself out.
Mostly yes, just tripping. She needs more time for the roots to breathe between waterings, but otherwise she’s healthy as can be.
Today is the big day! Currently waiting for them to take her back to behind the c section. Suspect another 40-60 minutes!
Congratulations growmie!
Liam Sawyer A. Is officially here! Weighing in at 8.8lbs (little cannonball) 19” long. He’s perfect!
Congrats Bro!
Now come the long sleepless nights!
Wish Momma the best!
Thats amazing! Congratulations!
No way - it’s never too early to take him into the grow tent and show him the wonders of gardening while treating him and the ladies to some soothing music. ![]()
![]()
Congratulations my friend @JordabGrows
You guys think my Great White Shark will be fine if I don’t water it today? I know that bitch is bone dry right now, but I don’t want to leave the hospital if I don’t have to. We’re supposed to come home tomorrow, and if not I’ll be going home to water everything, but will she survive if I skip the watering? She’s only 30 days old and still relatively small like 6 nodes or something like that. The overwatering really stunted her ![]()
![]()
Dont leave the hospital.
Liam is an Irish name meaning “strong-willed warrior” and “protector.” It is the shortened version of the Irish name Uilliam, meaning “helmet of will.”
While his name wasn’t chosen for that, it’s still cool to know where the name derives from and what it means. Especially considering that will be part of who he is as a person.
Also while watching videos on mainlining this guy is using a jug of water with yeast and sugar as CO2 generators which i can’t believe I didn’t think of but then I also realized I could totally make mead bc it’s the same thing only flavored lol granted I don’t need to be making a new batch of mead every 2-4 weeks it is still something that could be achieved lol.
I wonder what the benefits are as the light lowers from optimal bc it says to get the full effects not necessarily effects at all. The guy was saying that it puts off the same amount as a co2 supplement it just lasts longer. I’ll have to look into it and try to research some more bc if it’s beneficial even with less lighting, sugar, water, and yeast is pretty damn cheap lol especially if we’re talking 2-4 weeks.

